top of page
​Design Challenge
  • Fixtures needed to be discreetly integrated into the bridge steel structure

  • Required dual-mode support: static white light (3000K–4000K) and dynamic RGBW effects

  • Uniform light blending was essential to avoid colour separation or patchiness

  • Precision optical distribution required for long-range visibility from the riverbanks

  • All installation had to meet Japan’s strict waterproofing, seismic, and structural regulations

Product Solution
  • Custom-designed RGBW linear fixtures

  • Switchable CCT operation modes (3000K / 4000K) for daily static lighting

  • Full DMX protocol compatibility to enable festive dynamic lighting sequences

  • Light diffusion through blended light guides and frosted covers for seamless RGBW mixing

  • High-precision horizontal beam distribution set to 60° for long-span applications

  • Weather-resistant extruded aluminium and stainless-steel housing with anodised finish

  • IP67-rated waterproof protection with UV resistance, anti-corrosion, and seismic compliance

  • Modular driver and wiring infrastructure located in a centralised control room within the bridge for easy maintenance

2020 Tokyo Olympics Kamage Bridge

Custom

2020

Japan

Tokyo

This project was commissioned by the Tokyo Metropolitan Government as part of its urban bridge renovation programme prior to the 2020 Olympics. The bridge spans a key vehicular and pedestrian artery along the Sumida River—an area bustling with daily commuters and night-time tourists alike. The lighting design had to simultaneously enhance visibility, architectural clarity, and the overall cityscape.

2020 Tokyo Olympics Kamage Bridge

Tokyo

Product

Applications

2020 Tokyo Olympics Kamage Bridge

bottom of page